九九操逼视频性爱高清无码_歐美一級a片免費觀看視頻_99re免费视频观看_成人抖音软件下载_国产欧美亚洲精品a第二页_亚洲浓毛少妇毛茸茸_亚洲成?Ⅴ人片天堂网无码_被侵犯中文字幕久久久_国产日韩欧美区二区东京热_东北一级毛片_色欲aⅴ无码精品东京热_国产黄色在线观看网站

unified benefit
Location: Home > > Case Two

Ltd., Suzhou, planning 55 injection moulding machines, water, electricity, gas, centralised material supply system in one of the whole plant system. Water supply system, taking into account the number of machines, water supply distance and water pressure and flow and temperature and health control have high requirements for the system configured with high-power explosion rod machine, water storage tanks, square water towers and other equipment to ensure that meet the requirements. The use of 4 with 2 standby high head and high flow loading station to ensure uninterrupted operation of the system.

Central feeding system planning programme in order to achieve a great use of the workshop area, the corner of the workshop to build a steel platform. Stainless steel storage barrels and central console are placed under the platform, and central vacuum generator and energy-saving dry manipulator are placed on the platform to provide conveying power and drying treatment for raw materials. Because the drying equipments are many and centralised, the upper floor of the platform is closed with fireproof cotton rock boards, and there are 12 exhaust fans installed on the upper floor of the platform for discharging the centralised heat out of the workshop, which greatly reduces the temperature of the workshop. The noise of the vacuum generator is also reduced through the barrier, which greatly improves the working environment.

未標(biāo)題-5.jpg

CopyRight © 2024Dongguan Tongyi Plastic Machinery Manufacturing Co., Ltd Sitemap
WeChat

【W(wǎng)eChat】

Link: